An address, a kickoff meeting, and no survey.
The owner wants a site plan on the table Monday. A boundary survey isn't in the budget until the project is real, so nobody has ordered one. You still need to show where the building sits and which codes you're designing to.
Start from the address.
Site looks up the jurisdiction, adopted building and energy codes, climate zone, FEMA flood zone, elevation, wind and seismic inputs, and cites the source for each one. Where the county publishes parcel data, the boundary loads by itself; anywhere else you trace it over the aerial. Drop the building footprint and Site dimensions its nearest approach to the property line.
Confirm it, lock it, send it to the spec.
Tick each value as you check it, lock the set to the project, and export the site sheet with your titleblock for Monday. The code basis goes into the spec, and every section that asks for the building code, energy standard or climate zone answers from it. When the survey arrives, refresh the lookup: you see a diff before anything changes.
Code basis
IBC 2012 · ASHRAE 90.1-2007 · Climate zone 4A
Carries into 01 40 00 Quality Requirements, 26 51 00 Interior Lighting, 26 09 23 Lighting Control Devices, and the envelope targets for 08 51 13 Aluminum Windows