Use cases · six people, one thread

Make the call early.Keep it on the record.

An architect with no survey. A mechanical engineer with seven deadlines. A four-person office with no spec budget. A junior writing a first spec. An architect facing a council vote with no lighting engineer. An interior designer whose finish schedule and spec disagree. Each of them has to decide something early, and in SwiftSpec that choice becomes a recorded decision: cited where it came from, found in every section it touches, and carried through the project manual when it changes.

Scroll to move through their weeks. The orange thread on the left follows the decisions. The log at the bottom of each scene fills in as they're made.

UC-01The site with no survey1 · Situation

An address, a kickoff meeting, and no survey.

The owner wants a site plan on the table Monday. A boundary survey isn't in the budget until the project is real, so nobody has ordered one. You still need to show where the building sits and which codes you're designing to.

Project architectPre-designSite
UC-01The site with no survey2 · Move

Start from the address.

Site looks up the jurisdiction, adopted building and energy codes, climate zone, FEMA flood zone, elevation, wind and seismic inputs, and cites the source for each one. Where the county publishes parcel data, the boundary loads by itself; anywhere else you trace it over the aerial. Drop the building footprint and Site dimensions its nearest approach to the property line.

What it leaves blankZoning isn't in public data, so Site doesn't guess a setback. The field stays empty until you enter it from the county.
UC-01The site with no survey3 · Decision

Confirm it, lock it, send it to the spec.

Tick each value as you check it, lock the set to the project, and export the site sheet with your titleblock for Monday. The code basis goes into the spec, and every section that asks for the building code, energy standard or climate zone answers from it. When the survey arrives, refresh the lookup: you see a diff before anything changes.

D-01Locked · pre-design

Code basis

IBC 2012 · ASHRAE 90.1-2007 · Climate zone 4A

Carries into 01 40 00 Quality Requirements, 26 51 00 Interior Lighting, 26 09 23 Lighting Control Devices, and the envelope targets for 08 51 13 Aluminum Windows

UC-02The engineer out of hours1 · Situation

Seven projects, one pricing set, and the architect is waiting.

The contractor prices the job next week. The architect needs Division 23 now, not at 100% construction documents, and you're carrying six other projects. A full-length spec is weeks away. The estimator needs the basis of design in a form they can price.

Mechanical engineerSchematic designHVAC Study
UC-02The engineer out of hours2 · Move

Run the numbers next to the spec.

HVAC Study keeps loads and ventilation working from one room list and warns you when they drift apart. Duct, hydronic, equipment, gas-piping and acoustic calculators sit alongside, and the results roll up into equipment schedules. Print any calculation sheet for the file.

UC-02The engineer out of hours3 · Decision

Switch the spec to Outline and send it.

Set Spec depth to Outline and each section keeps only its core articles: basis of design, performance, the choices that move the price. Export Word by section, or a Sheet Spec sized for a drawing sheet. The architect imports your sections into the project manual. At design development, switch back to Full. The choices you made for pricing are already in it.

D-02Locked · issued for pricing

Mechanical basis

Packaged rooftop units · DX cooling · gas heat · economizer

Carries into 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units, the equipment schedule, and the architect's project manual

UC-03The office with no spec budget1 · Situation

Last job's manual, find-and-replace, and hope.

Four people, no spec writer, and a master-spec subscription that isn't in this year's budget. So the spec starts as a copy of the last project's Word files: the old client's name on page 212, a code edition from two cycles ago, and sections nobody remembers editing.

Small firm principalEvery phaseSpec Studio
UC-03The office with no spec budget2 · Move

Start from a building type, not a blank page.

Pick a starting point, such as an office fit-out, a retail shell, a medical fit-out or new construction, and SwiftSpec seeds a section list from a hand-authored office master library. Trim or add sections in Section Index. Every section is already in CSI three-part format, and its choices are pick-one brackets instead of red-lines to hunt for.

Runs in a browserNothing to install, and every project autosaves to your account.
UC-03The office with no spec budget3 · Decision

Hand over a real project manual.

Export one Word manual with a table of contents and per-section page numbers, or a bid set with the manual, the section register and a COMcheck starter file. Have years of your own Word masters? Try five of them in a sandbox and compare before and after. The import keeps your wording and marks only the choices.

D-03Locked · schematic design

Project scope

New construction, multi-story · 38 sections

Carries into the table of contents, the section register, and the bid set

UC-04The first spec1 · Situation

Owner will engage, or Contractor shall engage?

It's your first specification. The brackets read like a multiple-choice test nobody taught, and the senior who knows the answers is on site until Thursday. Pick wrong and the inspections get paid for twice, by the owner and through an allowance, or by nobody.

Junior architectDesign developmentSpec Studio
UC-04The first spec2 · Move

Ask the spec why.

Explain this choice gives a plain-language answer and a suggested option, and marks its source as unverified until you check it. Turn on Guidance to read the author's notes, which never print. Press F2 to jump to the next open bracket and watch the Open Items count go down.

Checked before it's trustedA suggestion is only a suggestion. Nothing is chosen until you press Choose.
UC-04The first spec3 · Decision

Answer once. It answers everywhere.

The testing-agency question appears in 21 sections of this project, and the decision board ranks it by that reach. Answer it there and all 51 brackets resolve together; the affected sections flash so you can see where it landed. The log records the time and the text before and after. If you change it later and someone has since edited one of those paragraphs, SwiftSpec refuses to overwrite the edit.

D-04Locked · design development

Testing agency

Owner will engage

Carries into 21 sections, including 01 21 00 Allowances, 03 30 00 Cast-in-Place Concrete and 07 50 00 Low-Slope Membrane Roofing

UC-05The council vote1 · Situation

Council meets Thursday. The lighting engineer starts next month.

The planning commission wants a site lighting study with the application: footcandles across the parking lot, and proof that the light stays on your side of the property line. There's no electrical engineer on the team yet, and the agenda won't wait for one.

Project architectEntitlementsLighting
UC-05The council vote2 · Move

Place the poles, run the grid.

Import the site linework or scale an aerial underlay, place fixtures from manufacturers' IES files, and run a point-by-point calculation. The Lighting tool reports average, maximum and minimum footcandles, uniformity ratios, BUG ratings and uplight, and checks light trespass at the property line against the limits you enter.

UC-05The council vote3 · Decision

Put the study in front of the council.

Export plan sheets with your titleblock: layout, fixture schedule, isolux contours and statistics. The fixture choices arrive in Spec Studio as proposed updates to 26 56 00 Exterior Lighting, and nothing changes until you accept them. When an engineer joins, they start from your layout and your numbers.

D-05Locked · entitlements

Site lighting

Full cutoff · 3000K · 20 ft poles

Carries into 26 56 00 Exterior Lighting and the lighting takeoff in the Energy Readout

UC-06Two finish lists1 · Situation

The finish schedule says LVT. The spec says VCT.

Finishes change a dozen times in design development. The finish schedule on the drawings keeps up, because the interior designer owns it. Division 09 doesn't, because it was copied from the last job and nobody told it. The contractor prices whichever one they read first.

Interior designerDesign developmentAssemblies
UC-06Two finish lists2 · Move

Build rooms, not paragraphs.

In Assemblies, lay out each floor with room types: office, corridor, conference, restroom, break room and more. Each room arrives with its usual components, and every component carries its CSI section. Swap a component and the section list changes with it. A room your office builds again and again can be saved as a template for the whole company.

Marked to verifyEvery component's section number is flagged for you to confirm, because offices file finishes differently.
UC-06Two finish lists3 · Decision

Send the rooms to the spec.

The outline collects every section the rooms need. Send to Studio adds them to the project manual and skips any section the project already has, so nothing is duplicated or overwritten. The finish schedule and Division 09 now start from the same picks.

D-06Locked · design development

Room finishes

Corridors LVT · conference carpet tile · acoustic ceilings

Carries into 09 65 00 Resilient Flooring, 09 68 00 Carpet, 09 51 13 Acoustical Panel Ceilings and 09 91 00 Painting

Why early matters

Decisions are cheapest when the spec is written first.

Early in a project, a decision costs little and shapes everything after it. Late in a project, the same decision costs a lot and shapes almost nothing. Specifications usually get written at the expensive end, to describe choices the drawings already made. When the spec is where the choice gets made, the work moves to the cheap end, and pricing, review and coordination all start from something written down.

Conceptual curve: the ability to shape cost and performance falls through the project phases while the cost of a change rises. Specifications are usually written during construction documents; SwiftSpec moves decisions into schematic design and design development. Pre-design Schematic Design dev. Construction docs Bidding Construction Spec usually written here Decided here in SwiftSpec Ability to shape cost and performance Cost of changing your mind Decisions move earlier
Ability to shape cost and performance Cost of changing your mind Spec written the usual way Decisions made in SwiftSpec

Conceptual, after the MacLeamy curve. The shapes are illustrative; no data is plotted.

More people on the same thread

Four more roles, four more decisions.

The six stories above aren't the only way in. Anyone who owns a decision on a project can make it in SwiftSpec, and it joins the same record: where it came from, where it lands, and what happens when it changes.

  • UC-07Technical director

    Twenty years of Word masters, and no appetite to retype them.

    Drop five of the firm's own sections into a sandbox project and compare before and after. The import keeps the firm's wording and marks only its choices. An admin can save any section as the firm standard, and new projects suggest the firm's answer first.

    Locks in
    Firm standard
    Lands in
    The suggested answer on every new project
  • UC-08Energy consultant

    Pick the compliance path before the envelope is drawn.

    Choose prescriptive, performance or high-performance. Enter the targets from the table your code names, and the most demanding assembly in the massing model sets each value. The Energy Readout flags any spec value weaker than your target.

    Locks in
    Compliance path
    Lands in
    08 51 13 Aluminum Windows (U-factor, SHGC)
  • UC-09Code consultant

    Fire ratings that come from the code study.

    Fire-resistance ratings, occupant loads and fixture counts come across from Code Analysis as project values. The firestopping, door-frame and glazing sections that ask for a rating answer from the study instead of from memory.

    Locks in
    Corridor rating
    Lands in
    07 84 00 · 08 11 13 · 08 80 00
  • UC-10Landscape architect

    A plant list the city will accept.

    Check the palette against the municipality's prohibited-species list, with the ordinance cited, and against the site's climate before it goes on the planting plan.

    Locks in
    Plant palette
    Lands in
    The planting plan and its details

The thread, pulled tight

Every answer, on the record.

Put the six stories into one example project: a two-story office on Main Street. Pick a decision to see where it lands. Then change one and watch the change travel. Two weeks after the vote, the council asks for warmer light. Try that one too.

Project manual · 38 sections

Decision log

    Start where the project starts

    Start with an address.

    Type the address, and the first decisions arrive with their sources. Everything you decide after that goes into the same record.